Correct service charge procedures
Residential leases usually contain detailed procedures that must be followed before valid demands for service charges can be raised. Some landlords sidestep such requirements for reasons of convenience, but an Upper Tribunal (UT) decision has underlined the hazards inherent in such a course.
The case of Jetha & Anr v Basildon Court Residents Company Limited (2017) concerned a prestigious block of 56 flats, the common parts of which were owned by a services company.
The tenants of 11 of those flats had refused to pay service charges due to various concerns about the property’s management. The company launched proceedings to recover arrears of more than £40,000.
The First-tier Tribunal (FTT) found that the lease did not provide for the collection of interim service charges on account. Those charges and contributions to a sinking fund maintained by the company had not been agreed at an annual general meeting (AGM), as required by the lease.
The FTT, however, found that the disputed bills were payable on the basis that the procedure employed by the company was well established and the tenants had never objected to it in the past.
In upholding the tenants’ challenge to the latter ruling, the UT noted that the requirement that service charges be approved by a majority at an AGM was an important safeguard. It was neither unfair nor unjust for the tenants to rely upon the letter of the lease and, in the circumstances, the disputed bills were not payable.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.